"Project Program Format"
(note: (mar 04)...this is a comprehensive format for development of the final building program for a natural building project...the most exhaustive developed by smart shelter to date...it is recommended that you not proceed very far into design until you have researched and screened all ingredients found here, contacted and secured requirements and recommendations from all the jurisdictions listed and held preliminary conferences with prospective service providers listed for their requirements, prices and recommendations. Beginning actual design prior to assembly of these ingredients will lead either to necessitated redesign, missed opportunities, cost over runs, budget overruns, conflict, wasted time...and sometimes...litigation.)
Project Identification:
Name of Owner:__________________________Phone: ____________(h) ___________(w)
Address: _____________________________________POB______________________
County: ______________________________ email:___________________________
City:______________________________State_____________Zip_________________
Site Location (directions)___________________________________________________
Legal Description_________________________________________________________
Current zoning ________________________________ elevation___________________
Lot Size ________________________ density allowed____________________________
Site Description (terain, vegetation, habitat, water courses, views, solar access,etc)_________
______________________________________________________________________
______________________________________________________________________
Project Concepts:
(Description of needs, functions and intents)_____________________________________
______________________________________________________________________
______________________________________________________________________
______________________________________________________________________
______________________________________________________________________
List all major functions the project must include:
List the capacities of the above functions (ie how many people, vehicles, bedrooms, baths, etc):
Estimated building size (sq ft)________________ Estim cost/Sq Ft____________
Project Time Frame
Building Program by_________ Building Design by___________
Break Ground by___________ Occupancy by _______________
Project Budget:
Estimated total cost or budget ceiling_________________________
Finance sources: Commercial________________________________amount___________
Personal__________________________________amount___________
Owner's Background & Function
Name__________________________________age_____occupation______________
Summary of building/development experience (include roles played)__________________
_____________________________________________________________________
_____________________________________________________________________
_____________________________________________________________________
What role will you play in the project? (ie contractor, finance, carpentry,labor)_____________
_____________________________________________________________________
_____________________________________________________________________
Do you have any direct training or experience to enable you to do that?_________________
If so, what?_____________________________________________________________
_____________________________________________________________________
What are your motives for building a sustainable project?____________________________
_____________________________________________________________________
_____________________________________________________________________
Designer's Background & Function
Name_______________________________________ phone____________________
Company ____________________________________ email _____________________
Address______________________________zip_____
Summary of relevant project experience_______________________________________
_____________________________________________________________________
_____________________________________________________________________
Finance, Insurance, Appraisal & Real Estate Sources
Finance Institution________________________Contact Person_________________
Address___________________________zip__________Phone___________________
______________________________________________________________________
Appraiser_____________________________________________Phone___________
address_________________________________________zip________
_____________________________________________________________________
Insurance Company___________________________Contact___________________
address____________________________zip__________Phone__________________
_____________________________________________________________________
Real Estate Agency__________________________Contact____________________
address____________________________zip__________Phone__________________
Builder/Contractor Background
Name of Builder (if owner, see above)_________________________________________
Company_______________________________________phone__________________
Address _______________________________zip_______email__________________
Summary of relevant project experience_______________________________________
_____________________________________________________________________
_____________________________________________________________________
_____________________________________________________________________
Years in business as builder______
Consultants List (list names and area of responsibility)
Sub Contractors/Installer's List (show trade fields)
Building Officials, Inspectors and Jurisdictions:
Planning and Zoning Commission____________________________________________
Building Covenants ______________________________________________________
Building Official _________________________________________________________
Sanitarian______________________________________________________________
Well Water Permits_______________________________________________________
Electrical Inspector_______________________________________________________
Plumbing Inspector ______________________________________________________
Other ________________________________________________________________
Is the intended use a conforming use under current codes and regulations?_____________
If not, what procedure will be required for variances?_______________________________
_____________________________________________________________________
Building Department Requirements:
Min. Lot size______________________________________________________
Setbacks: front____________side_______________rear___________________
Visual impact standards and mitigations___________________________________
Height restrictions __________________________________________________
Building footprint/lot size ratio__________________________________________
Aesthetic/historic requirements________________________________________
Energy efficinecy minimum standards____________________________________
Fire protection requirements/access_____________________________________
Flood plane restrictions ______________________________________________
Geologic Hazard restrictions___________________________________________
Sewage treatment standards/tests/water table problems______________________
__________________________________________________________
Water supply requirements/ testing______________________________________
Building materials restrictions __________________________________________
Roof loading requirements____________________________________________
Wind shear requirements _____________________________________________
Landscaping/ drainage requirements_____________________________________
Trash removal/storage requirements _____________________________________
Sustainable Building Systems Checklist/Critierion
Site Planning:
Conservation/Wildlife Easements
Riparian Habitat Preservation
Flood Plane avoidance/abatement
Development Impact Mitigation
Restoration on Environmental Assets
Clustered Development
Line of Sight/View Corridor considerations
Water Quality enhancement
Wetlands preservation, creation, enhancement
Soil Conservation
Permaculture Landscaping
Low impact/view access
Asphalt/roofing scouring ponds
Composting systems
Site catchment systems
Pond development
Contour irrigation
Local organic food production
Organic Livestock production
Integrated Pest management
Fencing
Privacy considerations
Security considerations/systems
Hydro-electric potential/development
Building Design Standards:
Sacred Geometry
Geopathic zones
Feng Shui
Space efficiency
Energy efficiency
Super insulated shell
Glazing-heat transfer efficiency
Wind location/ design shield
Berming/ subsurface
Solar access
Non-Blocking to adjacent structures
Roof Sheding
Non-Toxic materials/finishes
Low EMF/ mitigation
On site energy production
Integrated solar design
Integrated/separable greenspace
Passive/Active solarization
Water catchment/storage
Drip irrigation
Exterior patio spaces/microclimates
View development
Environmental Building Systems:
EI/ BRI standards (see EI questionaire)
EMF design, consulting, field measurements, mitigation
Passive Solar Design/massing
Trombe walls
Active Solar Design/ circulation/storage
Solar Hot Water
PhotoVoltaic Power Production
Wind Power Production
Hydro Power Production
Fuel Cell Power Production
Cogeneration
Grid-Tied Systems
Straw-based Shell
Earth -based Shell
Earth Ship Construction
Rastra Block
R-Planel Shell
Ice-block shell
Catchment roof system
Catchment storage
Water Sourcing
Water Filtration
Flow restrictors
Low flush toilet
Water Testing/treatment
Irrigation dispersment
Spas/pools
Humidity mitigation
Air filtration
Air-Air heat exchanger
Solar air pre-heater
Air infiltration/ blower door test
Air quality monitoring/ testing
Humidification/dehumidification
Gray-water system
Biological wastewater system
Composting toilet
septic system
lagoons
R-values- R-40+ roof R-30+ walls R-25+floor
R-4+ glazing
Cellulose insulation
No-formaldehyde fibre glass insulation
Nat Gas/Propane back up heat
Radiant Heating System
Radiant infloor heating system solar tied
Russian/Scandanavian Stove
Pellet/Low emission wood stove
Gas Hot Water Back up-solar preheat
On demand gas hot water heat
Passive cooling
Evaporatiave cooling
Interior partitions/mass walls-natural materials
Poured adobe floors
Stone floors
Salvage brick floors
No wall-to -wall carpet
Recycled materials
Low toxic finishes
Radon testing-mitigation
Daylighting
Energy efficinet lighting
No flourescent
High Efficiency appliances
Solar oven
Root/wine cellar
Other:
Building Program: (List all functions and requirements, their required sizes and spaces, specifications,and proximities or orientations to each other and the structure along with the number of occupants they need to be designed for)
Totals: (calculate relevant total square footages, costs, systems and budget)
System Schematics (design flow charts for systems inter-relationships)